Sublateral 84T - Cemetery Hill Pipeline

This project is a closed PVC pipeline that replaced the existing lateral canal off of the Secondary C Canal system.  This project starts south of Secondary C Canal and west of Range Road 234 and continues south and ends north of Township Road 264 northwest of Rockyford.  WID forces were responsible for the installation of approximately 3.4 km of PVC pipeline of varying sizes 200 mm (8 inch) to 500 mm (20 inch).  This project started in the fall of 2014 and was completed in the spring of 2015.    