Secondary "A" Canal Sublateral 81F11 Pipeline

This project is a closed PVC pipeline that replaces the existing lateral canal off of the Secondary A Canal system.  This project starts south of Secondary A Canal south of Township Road 234 and continues south and ends south of Township Road 232.  WID forces were responsible for the installation of approximately 4.3 km of PVC pipeline of varying sizes 100 mm (4 inch) to 400 mm (16 inch).  This project started in the fall of 2014 and was completed in the spring of 2015.